Construction of Flood Control System along Lumbang River
Construction of 786.00 lm of slope protection structures for flood mitigation along the Lumbang River.
CLIENT
DPWH - Masbate 2nd District Engineering Office
LOCATION
Masbate City
COMPLETED
December 2020
WORK CATEGORY
Flood Control - Construction - Slope Protection